Name of the Client: - Wardha Power Company Limited, (KSK Group, Hyderabad)
Project Name/Location : - HVAC at WPCL 4 X 135 MW, Warora, Chandrapur (M.H.)
Architect / Consultant: - Matrix India Limited.
Project Size:-
Application:- Industrial – Power Plant
Segment:- HVAC PD
Project Completion:- Targeted 18 Moths and actual completion in 16 Month
Scope of Work:- Installation, testing and commissioning of Air Conditioning, ventilation.
Equipments:-
Water Cooled Screw Chiller 128 TR – 3Nos
6 Nos Air Handling Unit – Floor Mounted
Cooling Tower – 2 Nos
Chilled Water pump – 3 Nos
Pressurize Expansion Tank
16 Air Washers (150000 CMH to 350000 CMH)
2 Nos Unitary Air Filter Unit
104 Roof Fans
180 Tube Axial Fans – Supply + Exhaust
Vertical Package AC – 30 Nos
Split AC – 120 Nos
Maharashtra Air Port Development Corporation
Name of the Client: - Maharashtra Air Port Development Corporation.
Project Name: - HVAC & FPS at Central Facility Building at MIHAN Nagpur.
Architect / Consultant: - Matrix India Limited.
Building Size:-
Application:- Comfort
Segment:-
Project Completion:- Targeted 6 Moths and actual completion in 8 Month
Scope of Work:-Design, Engineering, Procurement, Supply, Installation, testing and commissioning of Air Conditioning, ventilation and fire protection system in CFM Building.
Equipments:-
Air Cooled Screw Chiller Blue Star – 280 TR – 2 Nos
Air Cooled Screw Chiller Carrier Make - 280 TR – 2Nos
Air Handling Unit – 24 Nos Floor Mounted type
Chilled Water pump – 9 Nos
Air Handling Unit – 9 Nos Ceiling Suspended type
Fire Pumps
Lloyds Steel Industries Limited
Name of the Client: - Lloyds Steel Industries Limited.
Project Name/Location : - Centralised Air Conditioning for ECR 1, 2, 3 & 4
Project Completion:- Targeted 2 Moths and actual completion in 4 Month
Scope of Work:- Design, Engineering, Procurement, Supply, Installation, testing and commissioning of Air Conditioning of ECR Buildings at LSIL Wardha Plant.
Equipments:-
Water Cooled Screw Chiller 110 TR – 3 Nos
8 Nos Air Handling Unit – Floor Mounted
Chilled Water pump – 3 Nos
Pressurize Expansion Tank
Special Challenge:-It was a retro fit job where we replaced the old Air washers and ducting in the existing ECR rooms, the panel were live so working in that condition was quite challenging. The plant room location and area for AHU room selection was a complex and very congested as we have to adjust in the available space. The ECR room are very close to the HRM area so insulation of AHU rooms and exposed areas was critical .
Rama Magneto Mall Billaspur
Name of the Client: - Avinasha Developers Bilaspur .
Project Completion:- Targeted 2 Moths and actual completion in 4 Month
Scope of Work:- Design, Engineering, Procurement, Supply, Installation, testing and commissioning of Air Conditioning of complete Mall.
Equipments:-
Water Cooled Screw Chiller 130 TR – 3 Nos-
35-40 Nos Air Handling Unit – Floor Mounted
Chilled Water pump – 3 Nos
Condensor Water pump – 3 Nos
Cooling Tower – 3 Nos
Pressurize Expansion Tank
Air Cooled Ducted Air Conditioners 500 tr
Special Challenge:- Cater the need of different shops , multiplex and common areas was difficult, We offered Water cooled Chiller for shops, Multiplexes, and other areas, and the food court and common area was catered with air cooled ducted units.
Meditrina Hospital, Nagpur
Name of the Client: - Avinasha Developers Bilaspur .
Project Size:- 75 bedded with #4 OT, ICU and Diagnostic Center
Application:- Multi Specialty Hospital
Segment:- Hospital & Medical Care
Project Completion:- Targeted6 Moths and actual completion in 8 Month
Scope of Work:- Design, Engineering, Procurement, Supply, Installation, testing and commissioning of Air Conditioning & Ventilation of entire Hospital.
Equipments:-
VRV Units -90 HP, rooms and consulting areas
Modular OT with HEPA upto 0 .3 micron filtration AHU+DX
Air cooling of General Wards and reception area –4 Nos
Mortuary Unit- 2 Body.
ICU, ICCU, with AHU+DX 5 micron filteration
Special Challenge:- Space for floor mounted AHU for ICU, ICCU, was not available so we have to opt for ceiling suspended AHU , crossing beam and clear head room in passages was a challenge and the Noise of high static AHU was a challenge. Special acoustic treatment was done on trap doors to reduce the noise as low as 35-40 Db. Location of Mortuary in the basement was critical have created a fabricated structure to install it in the basement.